EN HU
  • Discover
    • News
    • Results
  • About us
    • The project
    • Members
    • Milestones
  • Publications
  1. Home

Publications

Gyarmati L., Orbán-Mihálykó É., Mihálykó C., Szádoczki Z., Bozóki S.: The incomplete Analytic Hierarchy Process and Bradley–Terry model: (In)consistency and information retrieval. Expert Systems with Applications, Volume 229, Part B, 120522, D1

Papp D., Regős K., Domokos G., Bozóki S.: The smallest mono-unstable convex polyhedron with point masses has 8 faces and 11 vertices. European Journal of Operational Research, 310(2):511-517, (2023), D1

Wegener K., Damm O., Harst S., Ihlenfeldt S., Monostori L., Teti R., Wertheim R., Byrne G.: Biologicalisation in manufacturing – Current state and future trends, CIRP Annals-Manufacturing Technology 72(2):781-807, (2023), D1

Tolio T. A. M., Monostori L., Váncza J., Sauer O.: Platform-based manufacturing, CIRP Annals-Manufacturing Technology 72(2):697-723, (2023), D1

Tamás A., Bálint D., Csáji B. Cs., Robust Independence Tests with Finite Sample Guarantees for Synchronous Stochastic Linear Systems. IEEE Control Systems Letters (L-CSS), 7:2701–2706, (2023), D1

Szentpéteri Sz, Csáji B Cs: Non-asymptotic state-space identification of closed-loop stochastic linear systems using instrumental variables. Systems & Control Letters 178 Paper: 105565 , 11 p. (2023), D1

Marosi A. C., Farkas A., Máray T., Lovas, R.: Towards a quantum-science gateway: a hybrid reference architecture facilitating quantum computing capabilities for cloud utilization. Helyion, 10 (2024) e29004, Q1

Pedone G., Szaller Á., Váncza J.: Exploring hidden pathways to sustainable manufacturing for cyber-physical production systems. Helyion, 10 (2024) e29004, Q1

Bentert M., Bredereck R., Györgyi P., Kaczmarczyk A., Niedermeier R.: A multivariate complexity analysis of the material consumption scheduling problem. Annals of Operations Research 328(2):1387-1408, (2023), Q1

Fischer, D., Györgyi, P. Approximation algorithms for coupled task scheduling minimizing the sum of completion times. Annals of Operations Research 328(2):1387-1408, (2023), Q1

Pagination

  • 1
  • 2
  • 3
  • 4
  • 5
  • › Next page
  • » Last page

1111 Budapest, Kende u. 13-17.

Judit Megyery, project manager
+36 1 279 6121

coprologs@hun-ren.sztaki.hu

© COPROLOGS